album_072305
(10 Slides)
[Page 1 of 1]
::
Jump To
- Page 1
3 walls up and working on the 4th.
Building the door and window headers.
95 degrees and 95 percent humidity...
Framing up a door way.
Holding down the fort.....
The 4th wall is almost ready....
Four exterior walls in place.
Packing up for the day...
Adding some finishing touches...
First floor exterior walls in place!
Album last updated on 7/27/05 5:22 PM
Powered by
JAlbum 5.2
and
BluPlusPlus
skin